Construction of 25.74m Long Radhanagar Bridge at 3rd km of Sunamganj-Kachirgati-Biswamberpur (Z-2804) Road, 3 Nos RCC Culverts at Different Roads and Raising/Correction of Slope of Approach Road of Eexisting 9 Nos Bridges, Construction of RCC Drain, Concrete Slope Protection With CC Block , Earth work etc. Under Road Division Sunamganj of Road Zone Sylhet During the Year 2023-2024. (WP-07)
Planning and Implementation: Cabinet Division, A2I, BCC, DoICT and BASIS